WestConnex Stage 3B Rozelle Interchange Twin Barrier
Description: TSS was engaged by JHCPB JV to supply and install the traffic barrier rails for the M4 Westbound Cut & Cover at Rozelle Interchange. It included the design and shop drawing of them.
Client: John Holland + CPB JV
Location: Rozelle Interchange site
Duration: Nov 2021 – Nov 2021