WestConnex M4-M5 Link Saint Peters’ Interchange Substation SS05 Steelworks
Description: Similar to the Haberfield SS01 substation, substation 5 at the Saint Peters’ Interchange site required several initial works to become fully operational. The scope TSS undertook involved the supply + install of structural steel items and the supply + install of checker plates alongside specialized screw-on clips.
Client: Acciona + Bouygues + Samsung JV
Location: Saint Peters’ Interchange site
Duration: Jan 2021 – Mar 2021